CWE-764 Detail

CWE-764

Multiple Locks of a Critical Resource
Incomplete
2009-05-27 00:00 +00:00
2023-06-29 00:00 +00:00

Alerte pour un CWE

Restez informé de toutes modifications pour un CWE spécifique.
Gestion des alertes

Multiple Locks of a Critical Resource

The product locks a critical resource more times than intended, leading to an unexpected state in the system.

Extended Description

When a product is operating in a concurrent environment and repeatedly locks a critical resource, the consequences will vary based on the type of lock, the lock's implementation, and the resource being protected. In some situations such as with semaphores, the resources are pooled and extra locking calls will reduce the size of the total available pool, possibly leading to degraded performance or a denial of service. If this can be triggered by an attacker, it will be similar to an unrestricted lock (CWE-412). In the context of a binary lock, it is likely that any duplicate locking attempts will never succeed since the lock is already held and progress may not be possible.

Informations

Modes Of Introduction

Implementation

Common Consequences

Scope Impact Likelihood
Availability
Integrity
DoS: Resource Consumption (CPU), DoS: Crash, Exit, or Restart, Unexpected State

Potential Mitigations

Phases : Implementation
When locking and unlocking a resource, try to be sure that all control paths through the code in which the resource is locked one or more times correspond to exactly as many unlocks. If the software acquires a lock and then determines it is not able to perform its intended behavior, be sure to release the lock(s) before waiting for conditions to improve. Reacquire the lock(s) before trying again.

Vulnerability Mapping Notes

Rationale : This CWE entry is at the Base level of abstraction, which is a preferred level of abstraction for mapping to the root causes of vulnerabilities.
Comments : Carefully read both the name and description to ensure that this mapping is an appropriate fit. Do not try to 'force' a mapping to a lower-level Base/Variant simply to comply with this preferred level of abstraction.

Notes

An alternate way to think about this weakness is as an imbalance between the number of locks / unlocks in the control flow. Over the course of execution, if each lock call is not followed by a subsequent call to unlock in a reasonable amount of time, then system performance may be degraded or at least operating at less than peak levels if there is competition for the locks. This entry may need to be modified to reflect these concepts in the future.

Submission

Name Organization Date Date Release Version
CWE Content Team MITRE 2009-03-03 +00:00 2009-05-27 +00:00 1.4

Modifications

Name Organization Date Comment
CWE Content Team MITRE 2011-06-01 +00:00 updated Common_Consequences
CWE Content Team MITRE 2011-06-27 +00:00 updated Common_Consequences
CWE Content Team MITRE 2012-05-11 +00:00 updated Relationships
CWE Content Team MITRE 2014-07-30 +00:00 updated Relationships, Taxonomy_Mappings
CWE Content Team MITRE 2020-02-24 +00:00 updated Relationships, Type
CWE Content Team MITRE 2020-08-20 +00:00 updated Relationships
CWE Content Team MITRE 2020-12-10 +00:00 updated Relationships
CWE Content Team MITRE 2023-01-31 +00:00 updated Description
CWE Content Team MITRE 2023-04-27 +00:00 updated Relationships, Time_of_Introduction
CWE Content Team MITRE 2023-06-29 +00:00 updated Mapping_Notes
Cliquez sur le bouton à gauche (OFF), pour autoriser l'inscription de cookie améliorant les fonctionnalités du site. Cliquez sur le bouton à gauche (Tout accepter), pour ne plus autoriser l'inscription de cookie améliorant les fonctionnalités du site.